Projects

Built for the floor, the field and the boardroom.

A selection of the products we're delivering right now, with the numbers behind them.

3Active products
2Client organisations
10Platform modules shipped to staging
4CNC machines modelled
01 — Manufacturing IIoT

S.S Engineering Works — CNC Analytics App

In progressMobileIIoT

The problem. Supervisors at a precision machining shop had no live view of their CNC machines. Uptime, part counts and alarms were only known after someone walked the floor.

The product. A read-only shop-floor analytics app that shows every machine's status, spindle load, shift output and alarm history on a phone. The client's brand colours can be changed in Settings.

4CNC machines: BFW Agni, BFW Vayu, COSMOS SM60, HAAS
63%Demo MVP milestone complete
3Phase roadmap: Demo → Firebase → Production
3Industrial protocols planned: MTConnect, OPC UA, FOCAS
ExpoTypeScriptZustandFirebasereact-native-svg
9:41●●● 5G
Shop FloorS.S Engineering Works · Shift A

Live demo · simulated data · tap a machine

02 — Energy & Infrastructure

Axis Energy — Project Operations Platform

Staging liveWebEnterprise

The problem. Energy projects involve clients, planners and site engineers, and each group kept its own spreadsheets, schedules and reports.

The product. One project cockpit with Gantt, Kanban, documents, schedules, analytics and daily progress reports (DPR). Each person sees only the projects and data their role allows.

10Workspace modules per project
5User roles, from client to admin
20Data tables protected by row-level security
2Healthy app instances behind load balancing
Next.js 14AWS ECS FargateCloudFront + WAFSupabase Postgres

Illustrative view of the Gantt module

03 — Field Operations

Axis Energy — Field Mobile App

In developmentMobileOffline-first

The problem. Site engineers often work where there's no signal, so progress updates got delayed, lost or entered twice.

The product. A field app that saves every update on the device and syncs it when a connection returns. Each update is hashed so it can never be recorded twice, and the app handles sync conflicts.

100%Of field capture works offline
1Minimum photo required per progress log
15 MBPer-image limit (JPEG, PNG, WebP)
SHA-256Idempotency so sync is duplicate-safe
ExpoSQLiteSupabaseTurborepo

Illustrative view of offline capture

How we work

A process that ships.

01

Discover

Visit the site, map the process and agree on the metrics that define success.

02

Design

Lock the architecture and prototype the key screens before writing production code.

03

Build

Typed, tested increments with a clickable demo every milestone.

04

Deploy

Staging first, with security controls, monitoring and health checks.

05

Support

Ongoing improvements, training and measurable outcomes.

Your project next

Let's build something that works on day one.